Home » Uncategorized
Category Archives: Uncategorized
WETEX 2024
Visit us at the Water, Energy, Technology, and Environment Exhibition (WETEX) from October 1-3, 2024, at the Dubai World Trade Centre (DWTC).
We are pleased to invite you to visit our booth at the WETEX 2024 Exhibition, which will be held from October 1 – 3, 2024, at the World Trade Centre in Dubai.
We believe this would provide an opportunity to meet, collaborate and discuss potential synergies. Our team will be showcasing our solutions in field of Automation, Water Quality Analysis and will be pleased to hear from you and explore ways that we can further support your business and requirements.
We are located in Hall 4, Booth A-5.
In-Country-Value Program (ICV)
In-Country-Value Program (ICV) was introduced in the year 2018 by ADNOC. The program aims to attain the optimum value from UAE’s nation’s oil and gas resources to stimulate the country’s economic growth and diversification.
The Abu Dhabi Department of Economic Development (ADDED), Abu Dhabi National Oil Company, Abu Dhabi Ports Company PJSC, Aldar Properties PJSC, Emirates Nuclear Energy Corporation, and Mubadala Investment Company (Participating entities) have also become a part of this program recently by implementing a unified In-Country Value (ICV) Program, Rev. 3.0.
Descon Automation Control System LLC received upgraded ICV certification
WETEX 2021
Descon Automation Control System LLC showcased products and solutions offerings at WETEX2021.
Equipment and solutions were prepared at Booth SN48, Hall 1A (South Hall).
Venue: Dubai Exhibition Centre EXPO 2020 Dubai.
Wetex 2021, Exhibition was from October 5 to October 7.
The exhibition offers a platform to achieve integration between all sectors of the energy industry and bring together trade and technical sectors whilst facilitating the creation of new trade opportunities, to exchange new ideas and experiences and showcase the latest innovations.
Innovative solutions and concepts are presented in these exhibitions which cater to various domains of industry in United Arab Emirates and help the surrounding clientele.
Feel free to contact info@desconllc.com for more on solution offerings.
Merry Christmas!
Take nothing for granted and be thankful that you have such great family and friends to spend this joyous season with.
Wishing you all a very delightful Christmas!
Ramadan Kareem
Working Hours during Ramadan
Descon Automation Control System LLC Dubai offices operations resumed for everyone from Sunday, 26th April 2020 onwards.
Our office work timings during the Holy month of Ramadan will be 8am~2pm (without any lunch break).
All staff who are required to attend Project Sites will be working from 7am~1pm.
As per the guidelines issued by UAE Govt, we will still continue to implement “work from home” policy for our employees in accordance to the work requirements.
Project Managers & Sales Managers would ensure that not more than 30% of their team members are present in office at any given time of the day.
Stay Safe, Stay Healthy!
Wishing you all a very blessed Ramadan!
Descon Automation Control System LLC Management Team
COVID19 ~ Update
To:- All Clients, Contractors and Suppliers
Subject :- Temporary Closure of Office due to COVID-19 Pandemic.
We have worked determinedly serving our customers’ requirements despite various operational impediments during last two weeks. I am immensely proud of the way my team has adapted to the current situation, juggling their lives to the best of their abilities.
We are constantly monitoring the evolving situation around COVID-19 pandemic which is having a significant impact on all of us. The Health, Safety and Well-being of our customers, our employees and the community remains top priority during these unprecedented times. Accordingly, We have decided to keep our offices closed for a further period of 10 days from 18th April 2020 to support the efforts of UAE Government and Dubai’s Supreme Committee of Crisis & Disaster Management which has been taking extraordinary measures to combat and limit the spread of highly contagious virus.
This decision of ours taken primarily for the health & safety of everyone around us may affect our present committed work and delivery schedules. Our dedicated team will stay in touch with all our clients, contractors & suppliers handling all their queries via virtual communications through emails and phone.
We are committed in providing exceptional services without compromising quality and overall customer satisfaction. We re-assure you that every effort shall be made to make-up for the time lost during this course of action and humbly request your support.
Collective efforts are vital to tide over this critical period.
Wishing you all Safe & Good Health
Management Team
Descon Automation Control System LLC, Descon Automation Control System and Descon Technology LLC
COVID-19 Update
To: All Clients, Contractors and Suppliers
As the COVID-19 situation is having a significant impact on all, and our team follow the precautions from local authorities carefully and have implemented a number of measures to limit the spread of COVID-19 and to protect employees, customers and society.
Due to the present pandemic situation of COVID-19, our management has decided to keep the offices closed from 24-March-2020 for a period of 14 (fourteen) days. This action of ours is to support the minimum quarantine period requirement and our contribution towards the nation’s effort to minimize the spread of this disease. During this period our Procurement, Assembly, Dispatch, Accounts and Engineering departments shall remain closed. This shall effect our present committed work and delivery schedules. We assure that upon resume of works, every effort shall be made to make-up for the time lost during this closure
As per this plan many employees work from home if at all possible, and all cross-border travels and external meetings have been cancelled unless extremely essential. In the coming period we try to stay in close contact with our customers and partners (principals, manufacturers and banking channels etc…) virtually. We encourage communications through emails and telephone. Personalized meetings shall be minimized during this period.
We request your support during these hard times and wish all safe & good health.
Visit by (ADWEA) delegates to KAMSTRUP facilities
Visit by Abu Dhabi Electricity & Water Authority (ADWEA) Pre-Qualification of KAMSTRUP Consumer Digital Water Meter being concluded.
Descon Automation Control System – Abu Dhabi office had been officially invited by the Federal Electricity and Water Authority (FEWA) to participate in many RFxs (Request For Quotation – online bidding) involving SMART Electronic Metering. Descon Automation Control System has qualified Engineers who understand the technology and can support its customers locally in all aspects of this business. Descon Automation Control System / Kamstrup team were successful in securing projects for supplying Smart Electronic Water Meters (wired and wireless wireless) to FEWA.
Similar to FEWA, Abu Dhabi Electricity & Water Authority (ADWEA) in Abu Dhabi region are in the process of pre qualifying Smart Meters and together with Kamstrup and Descon Automation Control System see an excellent opportunity in this field. This pre qualification process includes various reviews, verifications, sample demonstrations and factory visits. Joint efforts from Descon Automation Control System and Kamstrup have reached the factory visit stage concluded as on 06 November 2019.
About Kamstrup
Kamstrup is a world-leading supplier of energy and water metering solutions. Our solutions support utilities and are also applied in properties with individual metering. For 70 years, we have delivered reliable, cost-effective ways to measure and manage energy and water consumption worldwide. By anticipating our customers’ challenges, we enable them to run a better business and inspire smarter, more responsible solutions for the communities they serve. Our solutions include consumption meters, smart metering systems, hosting and services, analytics and smart grid applications. All products are produced with the highest certifications for environmental safety and quality in our automated production facilities in Denmark.
www.kamstrup.com
25 Years of Business in UAE
Formed on 1st April 1994 serving the role as instrumentation equipment distributor.
Activities included “Onshore And Offshore Oil And Gas Fields And Facilities Services Installation and Maintenance of Measurement and Control Equipment And Devices Trading””.
Extending instrumentation and automation solutions to the customers in United Arab Emirates.
White Paper On DMA Capability On Non Calculated Utility Losses
DMA Concept
The concept of District Metering Area (DMA) management was first introduced to the UK water industry in the early 1980’s in UK Report 26. According to that report, DMA is an area of a distribution system which is specifically defined (usually by the closure of valves) and in which the quantities of water entering and leaving the area are metered.
NRW Calculation
Non Revenue Water (NRW) is defined as the difference between the total volume of water Flowed IN TO the DMA and the total volume of water flowed OUT OF the DMA.
SOURCE of NRW:
- Leakage
- Calibration
- Lack of meters.
DESCON Designed DMA Solution
Supplied DMA System numerically integrates the Flow Rate Signal received from the flow transmitter to get the total volume at all times.
- This flowmeter totalized volume would provide the quantity of water flowed into the DMA.
- CPC System can receive this totalized volume from DMA System RTU.
- Consumer metering (consumption) data is also available at CPC System.
- Loss of utility water can be obtained by subtracting the “Cumulative total (sum) of all consumer metering data” from the “totalized volume” of DMA System RTU