Home » PoC System Inspection

PoC System Inspection

Another RTU system being inspected at Descon Technology LLC faciltiies in Dubai.

This was a kind of Proof Of Concept in new system development in terms of Operational Requirements.

Project: CONSTRUCTION & INFRASTRUCTURE FOR ALLAIM NEIGHBORHOOD- AL FOUAH

System inspected:

  • Bulk Meter Remote Terminal Unit
  • Human Machine Interface
  • BAYARD HydroGenie Intelligent Valve Controller
  • NiCd Battery backed DC Power Supply System
  • Hardware Configuration Inspection

feel free to contact info@desconllc.com for more details.

United Arab Emirates

Descon Automation Control System LLC
PO Box: 14675, Dubai, U.A.E.
Al Qusais Industrial Area 4, Warehouse 1, 2 and 3; Engineering Service & Automation Division
Assembly and System Integration Centre | Tel:+97142676766 | Fax: +97143375039
Abu Dhabi Office | Tel: +971 2 5519445 | Fax: +971 2 5519446
Email: info@desconllc.com

 

Powered by WordPress / Academica WordPress Theme by WPZOOM